Groundwater Testing

Our in house Subsurface Evaluators can handle all facets of Soil Testing and Groundwater Testing.

Installing a Geoprobe?

  • In the event the initial ground water sampling event detects levels below present remedial standards, the Remedial Action Report Addendum will be prepared for submittal to the NJDEP.
  • In the event the well point does not contain free product, and after the prescribed waiting period, the well point will be sampled for Volatile Organic Compounds (TCL VO+15) and Base Neutral Compounds (TCL BN+15 with SIM).  All purged water will be drummed and remain on site for future disposal.
  • A temporary well point will be installed via a Geoprobe drill rig and developed by ADS.  If possible the temporary well point will be installed directly through the former UST Excavation.
  • A field blank and trip blank will be obtained and analyzed during all groundwater sampling events. All samples will be forwarded to a NJDEP certified laboratory and analyzed for TCL VO+15 and TCL BN+15 with SIM.
Soil Testing NJ

Soil and Groundwater Testing

Installing a Monitoring Well?

  • The Remedial Action Report Addendum will be prepared for submission to the NJDEP.
  • In the event the initial ground water sampling event detects levels below present remedial standards, the Remedial Action Report Addendum will be prepared for submittal to the NJDEP.
  • A monitoring well will be installed and developed by ADS.  If possible the well will be installed directly through the former UST excavation.
  • In the event the well point does not contain free product, and after the prescribed waiting period, the well point will be sampled for Volatile Organic Compounds (TCL VO+15) and Base Neutral Compounds (TCL BN+15 with SIM).  All purged water will be drummed and remain on site for future disposal.
  • A field blank and trip blank will be obtained and analyzed during all groundwater sampling events.  All samples will be forwarded to a NJDEP laboratory and analyzed for TCL VO+15 and TCL BN+15 with SIM.
  • Upon approval and NFA from the NJDEP, ADS will mobilize to the site, properly decommission the well in accordance with NJDEP regulations and prepare and submit a Well Abandonment Report to the NJDEP.

Would you like to learn more about groundwater testing?